Ordos Grand Theater Introduction: The Ordos Grand Theater project was started on May 26, 2006 and completed and accepted on July 21, 2009. The planned construction land area is 22,700m, the total construction area is 38,406.5m, the total height of the small circle is 24.8m, and the total height of the large circle is 44.4m. The building draws on the shape of the headdresses of men and women of the Mongolian ethnic group in Ordos. The architectural lines are smooth and dynamic, highlighting the unique cultural connotation and spiritual outlook of the singing and dancing nation. It is a large-scale comprehensive building with one underground floor and three floors above ground that integrates theaters, concert halls, film and television cultural areas and offices.