Building structure introduction: The construction of the Bamboo Corridor began in May 2006 and took three years to complete. It starts from the foot of Zhaohu Mountain and goes straight to the top. The corridor is made of bamboo. There are 9 circular and polygonal bamboo pavilions in the corridor. The tops are all built with traditional Chinese wooden tile house structures, which is a wonder.