Introduction to Dujiangyan Water Conservancy Project: Dujiangyan Head Canal Hub is mainly composed of three main projects: Yuzui, Feishayan and Baopingkou. The three organically cooperate, restrict each other, and operate in a coordinated manner to divert water to irrigate fields, divert floods and reduce disasters, and have the effect of "dividing four to six and quelling droughts."
Attraction