
Stadium introduction: The stadium was renovated and put into use in November 2002. It is equipped with a 400-meter circular plastic track, an artificial turf football field and other facilities. The upper end is an open-air stand that can accommodate about 2,000 people. It is an important place for students to engage in outdoor sports.
Attraction