Introduction to the new museum: The new museum started construction in 2008, covering an area of 10,600 square meters, with two floors underground, four floors above ground, and a height of 24 meters. It was designed by the German KSP Design Office. The new museum has a total of 7 large, medium and small exhibition halls, including 2 large exhibition halls of 1,300 square meters, with an exhibition wall height of 6.5 meters. There are 3 showcase-style exhibition halls and 2 digital exhibition halls. There are 4 warehouses with constant temperature and humidity, and 1 multi-functional academic lecture hall.
Attraction