Reservoir introduction: The reservoir was completed in 1964. It is divided into a dam, a spillway, a drainage tunnel, a power plant, a rear pond, and the water inlets of Shimen Dazhen and Taoyuan Dazhen. It has irrigation, power generation, water supply, flood control and tourism. and other functions.