
Introduction to the dam: is a single-pier big-head dam with a concrete structure. The top elevation of the dam is 124 meters, the top length is 440 meters, the top width is 5 meters, and there are 3 holes in the spillway section.
Introduction to the dam: is a single-pier big-head dam with a concrete structure. The top elevation of the dam is 124 meters, the top length is 440 meters, the top width is 5 meters, and there are 3 holes in the spillway section.