Title introduction: The construction of the bridge started on November 22, 1994, and was completed and opened to traffic on September 28, 1999. President Jiang Zemin inscribed the name of the bridge and cut the ribbon for its opening.
Title introduction: The construction of the bridge started on November 22, 1994, and was completed and opened to traffic on September 28, 1999. President Jiang Zemin inscribed the name of the bridge and cut the ribbon for its opening.