Introduction to the beach park: The beach park and natural swimming pool were built at the end of Juzizhou. The park has a construction area of ​​about 13,000 square meters. In the park, a sun beach, a beach swimming pool, an indoor swimming center (a construction area of ​​3,800 square meters) and Indoor sports center (construction area of ​​about 3,000 square meters), indoor amusement center (construction area of ​​6,300 square meters) and outdoor playground, among which the total land area of ​​the beach park is about 20 hectares, which will be combined with the west coast waters to set up a sun beach, beach swimming pool, indoor Swimming center and other attractions.

Leave a Reply