Introduction to the beach park: The beach park and natural swimming pool were built at the end of Juzizhou. The park has a construction area of about 13,000 square meters. In the park, a sun beach, a beach swimming pool, an indoor swimming center (a construction area of 3,800 square meters) and Indoor sports center (construction area of about 3,000 square meters), indoor amusement center (construction area of 6,300 square meters) and outdoor playground, among which the total land area of the beach park is about 20 hectares, which will be combined with the west coast waters to set up a sun beach, beach swimming pool, indoor Swimming center and other attractions.
Attraction